Closing or Dismantling a Facility and Restoring the Site in Saudi Arabia: Environmental Obligations and Penalties

In Saudi Arabia the duty of the owner of an activity does not end when operations stop. The Environment Law and its implementing regulations deal with closure, rehabilitation of the site, removal of the effects of pollution and placing the cost on the person who caused it. This article sets out the rule, its scope, conditions and exceptions, the deadlines, the penalties and the procedure, and what matters in practice for a foreign company that closes or dismantles a facility and restores its site. It is limited to the environmental side.

The Rule: The Environmental Duty Extends to Closure

Article (3) of the Environment Law prevents any person from carrying out an environmental activity or an activity with an environmental effect except after obtaining a permit or licence, as the regulations specify. Article (4) requires the permit holder and the licensee to comply with the Law, the regulations, the conditions of the permit or licence and the related instructions and decisions issued by the competent authority. In its scope of application, the Implementing Regulation for Environmental Permits for the Construction and Operation of Activities, published in 2021, states that it applies to owners or operators of any activity with an environmental effect, new or existing, including construction, operation, modification, addition, expansion and closure.

Scope: Who the Provisions Address

The Regulation addresses the owner or operator of the activity, and defines an activity as any project or industrial, commercial or service facility or works or other activity expected to have environmental effects. The body that handles permits is the National Center for Environmental Compliance. The Implementing Regulation for Environmental Rehabilitation of Degraded Sites and Treatment of Contaminated Sites applies to all degraded or contaminated sites within the territory of the Kingdom, and defines environmental rehabilitation as every measure taken on an environmentally degraded site, or a site that suffered environmental damage, to return it to its natural state of environmental balance according to the standards set by the competent authority.

Closure Conditions in the Permit

The Permits Regulation allows the Center to include controls and conditions for closing activities within the conditions specific to environmental operating permits. The permit is issued with its validity period and any conditions the Center sets, and the permit holder must comply with them. The content of these controls depends on what the Center sets for each permit, so the owner of an activity should read the conditions of its own operating permit before any decision to close.

The Rehabilitation Plan for a Degraded Site

The Rehabilitation Regulation requires persons to prepare an environmental rehabilitation plan for the degraded site and submit it to the Center in four cases: when the Center approves the environmental classification of the activity and before the environmental permit is granted for some Category One activities, and the Center may specify those activities; within the environmental impact assessment study for Category Two and Category Three activities; when an incident in the activity requires rehabilitation of the damaged site; and when the Center requests it on the basis of inspection results or an environmental audit study.

The plan must be updated when the environmental audit study is submitted, when an incident requires rehabilitation, and when the Center requests it on the basis of inspection or audit results. The plan is prepared through a licensed service provider, and in exceptional cases the Center may accept its preparation by highly experienced bodies in this field that it has approved, provided the Center issues requirements and controls specifying the exceptional cases. The Center may request additional information or amend the plan's contents and structure as needed, without affecting its basic elements.

The Treatment Plan for a Contaminated Site

The same Regulation requires persons to prepare a plan for the treatment of contaminated sites and submit it to the Center in two cases: when an environmental pollution incident occurs during the construction, operation or closure phase of the activity, and when the Center requests it on the basis of inspection results or an environmental audit study. This plan is also prepared through a licensed service provider, and the Center may request additional information or amend the contents and structure without affecting the basic elements of the plan. Treatment of contaminated sites is defined as every measure taken on a contaminated site to return it to its natural state of environmental balance according to the standards set by the competent authority.

Review and Implementation of the Plan

The Center reviews the plan according to Annex (1) of the Regulation, and may go to the site to inspect it and match the details of the plan against the reality of the inspection. If the Center approves the plan, the person who submitted it undertakes to carry out its items in the manner and within the period stated in its results and recommendations.

The person or activity must carry out the approved plan, and if the plan must be amended it must obtain the Center's approval. It must submit periodic reports, as the Center specifies in the approval decision, on the progress made, documented by photographs, analysis results and an updated schedule, and must inform the Center immediately of any incident during the process. During implementation the Center may inspect the site and match it against the approved plan, and carry out any inspection, testing, measuring or examination during the site visit.

Liability and Costs

Under the Rehabilitation Regulation, every person who carried out an act or activity that led to degradation or pollution of the environmental media must stop the source of pollution, remove the pollution, rehabilitate the environment and treat it, and the person who caused the damage, pollution or degradation bears compensation according to the polluter pays principle. In the Regulation this means that the polluter bears the costs of field environmental studies, corrective measures, combating pollution, limiting its harm, environmental rehabilitation and the necessary compensation. Compensation in the Law is what the person who caused the harm pays to make good the harm or remove it, and it includes the cost of rehabilitation that he pays if he is unable to carry out the rehabilitation.

Article (8) paragraph (6) of the Law requires a permit holder or licensee who carries out activities that may produce emissions or pollutants, or may affect the environmental media, to rehabilitate the environmental media degraded as a result of his activities as the regulations specify, and the competent authority specifies the activities referred to in the article. Article (43) requires the violator to remove the effects of the violation, rehabilitate and pay compensation as the regulations specify. The Permits Regulation provides that the permit holder is responsible for any environmental effect, and for treating it, if it appears during the phases of the activity and was not stated in the studies submitted to the Center or was based on false information.

Dismantling and Removal

The Environment Law defines the environmental impact assessment study as a study to identify, estimate and assess the environmental effects that may result from constructing, operating, modifying or removing any project or activity, and this is what links removal to environmental effect. The acts listed in Article (35) of the Law include throwing, discharging or injecting untreated wastewater or liquid components into underground wells or any environmental medium for any reason, and disposing of hazardous waste in the environmental media.

Inspection and the Precautionary Measure

Inspectors, designated by decision of the Minister or the chairman of the board of the competent authority, detect violations, investigate them and record them. Before entering facilities to inspect them and review their records and data, the inspector must coordinate with the supervising authority, a duty that applies only to the facilities that the regulations classify as covered by it. If needed, the inspector may take samples of materials and items at a facility suspected of a violation, with a seizure record of the particulars, and, at the violator's expense if the violation is proved, hold the vehicles and tools used in committing the violation and submit this to the competent court within no more than 7 days to confirm or lift the hold, under Article (36). Preventing or obstructing the inspector is prohibited.

Article (44) allows the Minister or the chairman of the board of the competent authority, or their delegate, after coordination with the supervising authority, to stop the activity partly or fully for no more than 15 days when a violation requiring urgent action to avoid an environmental disaster is detected, and to refer the violation to the competent court or committee within 5 days of the stop. The body to which it is referred considers whether the stop needs to continue within no more than 10 days of the referral.

Penalties

The following are the general sanctions of the Law. They are stated apart from the duties in the sections above and are not tied to any one of them. Without prejudice to Articles (40) and (43) and to any more severe penalty in another law, whoever violates the provisions of the Law and the regulations is punished under Article (38) by one or more of the following: a fine of up to 20,000,000 riyals, suspension of the licence or permit for no more than 6 months, and cancellation of the licence or permit. The Minister issues tables classifying violations and setting penalties within this limit according to the nature and gravity of each violation and the aggravating and mitigating circumstances. Subject to paragraph (2) of Article (39) and to Article (41), under paragraph (1) of Article (39) the competent authority imposes a fine of up to 100,000 riyals according to the tables, and violations are examined and the penalties in Article (38) imposed by committees formed by the Minister for 3 years, renewable, of at least 3 members.

Under Article (38) paragraph (3), the committees may impose a fine for each day the violator continues the violation after being notified of the committee's decision, double the fine or the suspension imposed on the violator if the same violation is repeated within one year of the date the previous penalty decision became final, except as provided in Article (40) paragraph (2), and include in the decision the publication of its summary at the violator's expense according to the type, gravity and effect of the violation, with publication after the decision becomes immune by lapse of the period set by law or the judgment acquires finality. Article (40) provides for imprisonment of up to 10 years and a fine of up to 30,000,000 riyals, or either penalty, for whoever commits the acts in Article (35), and the competent court considers these violations under Article (41).

Objecting to Decisions

Under the Permits Regulation the applicant for a permit may object in writing to the Center's decisions on environmental permits before the Center within 15 working days of notification, objections received after the period are not accepted, and the Center must decide on them within 30 working days of receiving them. Under Article (39) paragraph (4), decisions of the committees may be objected to before the Administrative Court.

Practical Risks for a Foreign Company

The first risk is treating closure as a purely commercial decision without reading the conditions of the operating permit, which may include closure controls. The second is delay in submitting the rehabilitation or treatment plan when the Center requests it after an inspection or audit. The third is preparing the plan through an unlicensed party, because preparation is through a licensed service provider except in exceptional cases the Center accepts. The fourth is starting to carry out the plan without the Center's approval of it. The fifth is failing to inform the Center immediately of an incident during implementation. The sixth is assuming that stopping the activity ends liability, while the person who caused the damage bears the compensation and the cost of rehabilitation under the Rehabilitation Regulation. The seventh is submitting reports or studies in a language other than Arabic, since the rule is submission in Arabic and the Center may accept part of them in English.

Hypothetical example: while a unit is being dismantled at a closed site, a polluting liquid leaks into the soil. This is a case of a pollution incident during the closure phase, so a treatment plan for the contaminated site must be prepared through a licensed service provider and submitted to the Center, and the person who caused it bears the cost of treatment and compensation.

Frequently Asked Questions

Does the environmental duty end as soon as operations stop?

No. The Permits Regulation applies to construction, operation, modification, addition, expansion and closure of activities, and the Rehabilitation Regulation remains applicable to degraded or contaminated sites within the territory of the Kingdom.

Who sets the closure controls?

The Center, which may include controls and conditions for closing activities within the conditions of environmental operating permits.

When is a rehabilitation plan required?

In the four cases in the Rehabilitation Regulation: before the permit is granted for some Category One activities, within the impact assessment study for Category Two and Category Three activities, when an incident requires it, and when the Center requests it on the basis of inspection or audit.

Who prepares the plan?

A service provider licensed by the Center, and in exceptional cases the Center may accept highly experienced bodies that it has approved.

Who bears the cost of rehabilitation and compensation?

The person who caused the harm, pollution or degradation, under the polluter pays principle, and compensation includes the cost of rehabilitation if he is unable to carry it out.

What is the general penalty for violating the provisions of the Law and the regulations?

Under Article (38) paragraph (1), whoever violates any provision of the Law or the regulations is punished by one or more of the following: a fine of up to 20,000,000 riyals, suspension of the licence or permit for no more than 6 months, or its cancellation, without prejudice to Articles (40) and (43) and to any more severe penalty in another law. Under paragraph (3) of the same article, the committees may impose a fine for each day the violation continues after the committee's decision is notified, and may double the fine or the suspension if the same violation is repeated within one year of the date the previous penalty decision became final, except as provided in Article (40) paragraph (2).

Where may an activity owner object to the Center's decision on a permit?

Before the Center in writing within 15 working days of notification, and the Center decides within 30 working days, while decisions of the committees are objected to before the Administrative Court.